1. Work with the building owner or contractor to provide a DAS estimate
  2. Create a final design based on IBwave software for signal propagation and hardware requirements
  3. Installation – we work with the contractor (or handle the full installation if needed)
  4. Test – performance verification will be tested by our FCC certified technicians after install
  5. Turn Up System –Coordinate with the radio system owner and verify with the Authority Having Jurisdiction (AHJ) that the system is operating as it should.
  6. Acceptance – Once the new system is approved by the AHJ, the building will be ready to receive its temporary certificate of occupancy.
  7. Maintain – Annual or bi-annual inspection of the system is required by the AHJ to maintain effectiveness.